Labour rate and markup calculator

Enter the crew size, days and the hourly labour cost. The calculator adds overheads and profit using the cost-estimate formula (labour + materials + equipment + overheads + profit) and shows the charge-out rate, net and gross price.

Advertisement

1. Labour

Advertisement

2. Markups and VAT

3. Equipment and materials

Result

Man-hours
Labour
Overheads
Profit
Charge-out rate per man-hour (excl. VAT)
–
Markup factorMaterials incl. purchase costsVATGross price
Net price (excl. VAT)
–
Unit prices are indicative (2026) and editable – enter your own shop or quote price.
Advertisement

Price breakdown

ItemQuantityCost

How we calculate

Man-hours = workers × days × hours. Labour = man-hours × rate. Overheads are taken from labour + equipment, profit from labour + equipment + overheads. Price of work = labour + equipment + overheads + profit. Materials are increased by purchase costs. Charge-out rate = price of work ÷ man-hours. Example: labour + equipment 10,000, overheads 70% = 7,000, profit 12% of 17,000 = 2,040, total 19,040 net.

Rates are indicative and editable. The Polish defaults come from our 2026 rate overview (labour 32–55 PLN per man-hour depending on the region, overheads 60–85%, profit 8–18%). Values for other markets are rough starting points, not a quote.

Advertisement
Advertisement

How the calculator works – questions and answers

What is a construction man-hour rate in 2026?

In Poland the estimating labour rate in 2026 is about 32–40 PLN per man-hour in the east, 38–48 PLN in Małopolska, Silesia, Lower Silesia and Wielkopolska, 40–50 PLN in the Tricity and 42–55 PLN in Warsaw. Overheads and profit are added on top.

What are overheads and profit in a cost estimate?

Overheads cover management, office, accounting, liability insurance and site supervision. They are taken from labour plus equipment, usually 60–85% in Poland. Profit is taken from labour, equipment and overheads together, usually 8–18%.

How do I price labour with markups?

Multiply the man-hours by the rate, add equipment, add overheads on that sum and then profit on the total. With 200 hours at 50, overheads 70% and profit 12% the work costs 19,040 net, which is 95.20 per man-hour.

Why is the customer rate much higher than the worker’s pay?

On top of pay come employer contributions, holidays and sick leave, safety gear, travel and tools, then office costs and profit. A contractor who adds only profit to bare labour ends up subsidising the job.

Which VAT rate applies to building work?

In Poland 8% applies to housing covered by the social housing programme (flats up to 150 m², houses up to 300 m²) and 23% otherwise. Enter the rate that applies to your job and country.